of
FO
Formard
Rebuilding Stips M Lot 37 A West side only...... 85 ft lin : Sea Wall Bonhom Strand West... Rebuilding Stips at end of Bonham Strand
West. Labor and Material.
Pusetting 200 ft lin: Parapet beteventionham Strand and
Queen Street
←
گئے
100 ft lin Sea Wall at end of Queen Street. Resetting Stips Toee Mee Ailey West side mly. Later Matwal Rebuilding Steps Soi Noe Lane, both sides Labor Marial 70 ft lin Sea, Hall, East of Eastin Street. Resetting Stips Eustin St one side only, haber Material
18. 440 ftlin Sea Wall between Eastän St and Centre St cx5 Dr. Stips Mt. Lot 81. both sides Labor and Materials Do Steps of Pier M. Lot 97 one side only Labor Material. Dr Sips M Lot 187 both sides Faber & Material. 20 ft Lin Sea Wall, M. Lot 187
100
Do
Ne Lot 199
Repairing Sea Wall M. Lot 198 Laber and
Material
9190
528
200
1700
400
30
of 20
2000
100
400
eX20
1400
100
2.200
200
700
200
ay 20
400
Jef 20
2000
20
Tornard.
20660
No comments yet.
Private notes are available after approval.